POSITION: Which best describes your current position?,EXPERIENCE: How many years of work experience do you have?,TEAM SIZE: Number of IT/Systems/Development people in your organization,SECTOR: Which sector is your organization primarily in?,LOCATION: Where are you located?,AGILE EXPERIENCE: How much experience at agile software development do you personally have?,"PHASE: What ""phase"" is the project currently in?",TEAM SIZE: How many IT people are/were on the project team?,"REGULATORY COMPLIANCE: Does/did your project team need to comply to industry regulations (such as Sarbane-Oxley, FDA CFR 21 Part 11, ...)?","CMMI: Does/did your project team follow a CMMI (Capability Maturity Model Integrated) complaint process? Note: You may not have been officially audited, but if your team claims to be CMMI level X compliant please indicate the level.",DISTRIBUTION: How distributed are/were the IT people involved with your project?,"ORGANIZATIONAL DISTRIBUTION: Does/did everyone on the team work for the same organization? If some people on the work for a different company/organization than you do, perhaps they are consultants or contractors, then answer ""no"".","EFFECTIVENESS: From the following list of practices, please choose up to seven which you have found to be most effective on agile projects.",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"EASE OF LEARNING: From the following list of practices, please choose up to seven which you have found very EASY to learn.",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"DIFFICULTY OF LEARNING: From the following list of practices, please choose up to seven which you have found very DIFFICULT to learn.",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"ABANDONED: From the following list of practices, please choose up to seven which you have tried but then decided to stop following.",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"WANT TO ADOPT: From the following list of practices, please choose up to seven which you would like to adopt but have not yet done so.",,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Response,Response,Response,Response,Response,Response,Response,Response,Response,Response,Response,Response,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,Burndown Tracking,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,Database Refactoring,Database Regression Testing,Deploy into Production,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),Executable Specifications,Feasability Study,Feature Team,High-Level Release Planning,Identify Project Vision,Initial Architecture Envisioning,Initial Estimate and Schedule,Initial Requirements Envisioning,Iteration Demo,Iteration Planning,Just In Time (JIT) Model Storming,Pair Programming,Parallel Independent Testing,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,User Interface Refactoring,User Interface Testing,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,Burndown Tracking,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,Database Refactoring,Database Regression Testing,Deploy into Production,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),Executable Specifications,Feasability Study,Feature Team,High-Level Release Planning,Identify Project Vision,Initial Architecture Envisioning,Initial Estimate and Schedule,Initial Requirements Envisioning,Iteration Demo,Iteration Planning,Just In Time (JIT) Model Storming,Pair Programming,Parallel Independent Testing,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,User Interface Refactoring,User Interface Testing,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,Burndown Tracking,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,Database Refactoring,Database Regression Testing,Deploy into Production,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),Executable Specifications,Feasability Study,Feature Team,High-Level Release Planning,Identify Project Vision,Initial Architecture Envisioning,Initial Estimate and Schedule,Initial Requirements Envisioning,Iteration Demo,Iteration Planning,Just In Time (JIT) Model Storming,Pair Programming,Parallel Independent Testing,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,User Interface Refactoring,User Interface Testing,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,Burndown Tracking,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,Database Refactoring,Database Regression Testing,Deploy into Production,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),Executable Specifications,Feasability Study,Feature Team,High-Level Release Planning,Identify Project Vision,Initial Architecture Envisioning,Initial Estimate and Schedule,Initial Requirements Envisioning,Iteration Demo,Iteration Planning,Just In Time (JIT) Model Storming,Pair Programming,Parallel Independent Testing,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,User Interface Refactoring,User Interface Testing,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,Burndown Tracking,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,Database Refactoring,Database Regression Testing,Deploy into Production,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),Executable Specifications,Feasability Study,Feature Team,High-Level Release Planning,Identify Project Vision,Initial Architecture Envisioning,Initial Estimate and Schedule,Initial Requirements Envisioning,Iteration Demo,Iteration Planning,Just In Time (JIT) Model Storming,Pair Programming,Parallel Independent Testing,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,User Interface Refactoring,User Interface Testing Other,20+ years,51 to 100,Other,North America,5-10 years,Construction (building the system),10-Jun,No,CMMI level 2,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,Developer Regression Testing (non-TDD),,,,,,,,,,,,Just In Time (JIT) Model Storming,Pair Programming,,Potentially Shippable Software Each Iteration,,,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,,Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,Burndown Tracking,,,,,,,,,,,,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,10 to 20 years,11 to 50,e-Commerce,North America,3-4 years,Construction (building the system),5-Jan,No,Don't Know,Some people in separate cubes in the same building,No,,,,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,,,,,,,Retrospectives,,,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,Retrospectives,,,,,,,,,,,Database Refactoring,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Deploy into Production,,,,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,, IT Manager,20+ years,1000+,Technology (inc. Software),North America,3-4 years,Elaboration (proving the architecture),51-100,No,Not CMMI compliant,Some people are very distant,Yes,,Active Stakeholder Participation,Burndown Tracking,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,Identify Project Vision,,,,Iteration Demo,Iteration Planning,,,,,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,Deploy into Production,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,Feasability Study,,,Identify Project Vision,,,,,,,,,,,,, Other,20+ years,1000+,Technology (inc. Software),Europe,3-4 years,Elaboration (proving the architecture),51-100,Yes,CMMI level 4,Some people are very distant,No,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Iteration Planning,,,,,,,,,,,,,,,,,,,,,,Executable Specifications,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,User Interface Testing,,,,,,Collective Code Ownership,,,,,,,,,,,,,,,,,,,,,,,,, Business Stakeholder,Less than 2 years,51 to 100,Government,Europe,< 1 year,Construction (building the system),101-200,No,Don't Know,"People in different buildings, some potentially at home, but within driving distance",No,,,,,,,,,,,,,,,,,,,,,,Iteration Demo,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,Executable Specifications,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Retrospectives,, Developer/Agile Team Member,20+ years,11 to 50,Other,North America,5-10 years,Production,20-Nov,Yes,Don't Know,Some people are very distant,Yes,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,Burndown Tracking,,,Collective Code Ownership,,Daily Stand-Up Meeting,,,,,,,,,,,,Initial Estimate and Schedule,,Iteration Demo,,,,,,,Retrospectives,,,,,,Code Refactoring,,,Continuous Integration (CI),,,,,,,,,,High-Level Release Planning,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Parallel Independent Testing,,,,, Team Lead/Scrum Master,10 to 20 years,51 to 100,Technology (inc. Software),North America,< 1 year,Construction (building the system),5-Jan,No,Not CMMI compliant,Some people in separate cubes in the same building,Yes,,Active Stakeholder Participation,,,,Collective Code Ownership,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,Initial Requirements Envisioning,,,,,,,,Retrospectives,,,,,Burndown Tracking,,,,,,,,,,,,,,,,Initial Architecture Envisioning,,,Iteration Demo,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Initial Architecture Envisioning,,Initial Requirements Envisioning,,,,,,,,,, Product Owner,10 to 20 years,11 to 50,Technology (inc. Software),Australia/NZ,1-2 years,Construction (building the system),10-Jun,No,Not CMMI compliant,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,Identify Project Vision,,,,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,,,Database Regression Testing,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,,,,,,,,,, Developer/Agile Team Member,10 to 20 years,1000+,Technology (inc. Software),Europe,5-10 years,Construction (building the system),20-Nov,Yes,Not CMMI compliant,"People in different buildings, some potentially at home, but within driving distance",No,,,,,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,Identify Project Vision,,,Initial Requirements Envisioning,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,Deploy into Production,,,,,Feature Team,High-Level Release Planning,Identify Project Vision,Initial Architecture Envisioning,,,,,,,,,,,,,,,,Code Refactoring,,,,,,,,,,,,,,,,,,,,,,Parallel Independent Testing,,,,,,,,,,,Collective Code Ownership,,,,,,,,,,,,,,,,Iteration Demo,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,, Team Lead/Scrum Master,10 to 20 years,501 to 1000,Technology (inc. Software),North America,< 1 year,Construction (building the system),10-Jun,No,Not CMMI compliant,Some people are very distant,Yes,,Active Stakeholder Participation,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,Ranked Work Item List/Product Backlog,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,Deploy into Production,,,,,,,,,,,,,,,Parallel Independent Testing,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, IT Manager,10 to 20 years,11 to 50,Retail,North America,< 1 year,Iteration 0/Start Up/Inception,10-Jun,Yes,Not CMMI compliant,Some people are very distant,Yes,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,,,,,Retrospectives,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,Continuous Integration (CI),,,Database Regression Testing,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Collective Code Ownership,,,Database Refactoring,,,,,Executable Specifications,,,,,,,,,,,Pair Programming,,,,,, Team Lead/Scrum Master,20+ years,51 to 100,Technology (inc. Software),North America,1-2 years,Construction (building the system),5-Jan,No,Not CMMI compliant,Some people are very distant,Yes,Acceptance/Story Test-Driven Development (TDD),,,,,Collective Code Ownership,,Daily Stand-Up Meeting,,,,,,,,Feature Team,,,,,,,,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,Feature Team,,,,,,Iteration Demo,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,,,,,Active Stakeholder Participation,Burndown Tracking,,,Collective Code Ownership,Continuous Integration (CI),,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,Continuous Integration (CI),,,,,,,,,,,,,,,,,,,,,,,,,,,Burndown Tracking,,,,,,,,,,Developer Test-Driven Development (TDD),,Feasability Study,,,,,Initial Estimate and Schedule,,,,,,,,,,, Team Lead/Scrum Master,10 to 20 years,51 to 100,Government,North America,3-4 years,Transition/Release/End-Game (deliverying into production),10-Jun,No,Don't Know,Some people in separate cubes in the same building,No,,Active Stakeholder Participation,,,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,,,Just In Time (JIT) Model Storming,Pair Programming,,,,,,,,Active Stakeholder Participation,,,,,,Daily Stand-Up Meeting,,,,,,,Feasability Study,,,,Initial Architecture Envisioning,,,,,,,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,Just In Time (JIT) Model Storming,,,,,,,,,,,,,,,,,,,,Developer Test-Driven Development (TDD),,,Feature Team,,,,,,,,,,,,Ranked Work Item List/Product Backlog,,, Developer/Agile Team Member,10 to 20 years,11 to 50,Other,Europe,5-10 years,Construction (building the system),5-Jan,No,Not CMMI compliant,"People in different buildings, some potentially at home, but within driving distance",No,,,,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,Initial Architecture Envisioning,,,,,,Pair Programming,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Daily Stand-Up Meeting,,Database Regression Testing,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,Feature Team,,,,,,,,Just In Time (JIT) Model Storming,,,,,,, Developer/Agile Team Member,10 to 20 years,1 to 10,IT Consulting,Europe,1-2 years,Iteration 0/Start Up/Inception,5-Jan,No,Don't Know,Co-located in a single room,Yes,,,,Code Refactoring,,,,Daily Stand-Up Meeting,,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,,,,Initial Architecture Envisioning,,,,,Just In Time (JIT) Model Storming,,,,Ranked Work Item List/Product Backlog,,,,,,,Code Refactoring,Coding/Database/UI Standards,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,10 to 20 years,101 to 500,Government,Europe,1-2 years,Don't Know,20-Nov,No,Not CMMI compliant,Co-located in a single room,No,,Active Stakeholder Participation,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,Iteration Demo,,,,,,,,,,,,,,,,,,,,,,,,,,,Identify Project Vision,,,,,,,,,,,,,,,,,,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,, Other,Less than 2 years,1 to 10,e-Commerce,North America,< 1 year,Construction (building the system),5-Jan,Yes,Not CMMI compliant,Co-located in a single room,Yes,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Other,10 to 20 years,11 to 50,Financial,South/Central America,5-10 years,Construction (building the system),20-Nov,No,Not CMMI compliant,Some people are very distant,Yes,,Active Stakeholder Participation,Burndown Tracking,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,Initial Requirements Envisioning,,Iteration Planning,,,,,,,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,,Retrospectives,,,,Active Stakeholder Participation,,,,,,,,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,Initial Estimate and Schedule,Initial Requirements Envisioning,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Code Refactoring,,Collective Code Ownership,,,Database Refactoring,Database Regression Testing,,,,,,,,,,,,,,,,,,,,, Product Owner,5 to 10 years,1 to 10,Other,Australia/NZ,< 1 year,Construction (building the system),10-Jun,No,Don't Know,"People in different buildings, some potentially at home, but within driving distance",No,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,Initial Requirements Envisioning,Iteration Demo,,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,Identify Project Vision,,,,,,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,,,,,,,,,,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,5 to 10 years,1000+,IT Consulting,Asia,3-4 years,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,5 to 10 years,501 to 1000,IT Consulting,Asia,1-2 years,Construction (building the system),21-50,Don't Know,Not CMMI compliant,Some people in separate cubes in the same building,No,,Active Stakeholder Participation,,,,Collective Code Ownership,Continuous Integration (CI),,,,,,,,,,,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,Coding/Database/UI Standards,,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,Iteration Demo,,Just In Time (JIT) Model Storming,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,,,Continuous Integration (CI),,Database Refactoring,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,Database Refactoring,Database Regression Testing,,,,,,Feature Team,,,,,,,,,,Parallel Independent Testing,,,,,,,,,,,,,,Database Refactoring,,,,,Executable Specifications,,,,,,,,,,,,,,,,,User Interface Testing Other,20+ years,101 to 500,Financial,Europe,< 1 year,Construction (building the system),21-50,Yes,Don't Know,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,,,Continuous Integration (CI),,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,,,Coding/Database/UI Standards,,,,Database Refactoring,Database Regression Testing,Deploy into Production,,,,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Coding/Database/UI Standards,,,,Database Refactoring,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,10 to 20 years,1 to 10,Technology (inc. Software),Europe,5-10 years,Transition/Release/End-Game (deliverying into production),5-Jan,No,Not CMMI compliant,Some people are very distant,Yes,,,,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),,,,Deploy into Production,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,,,,,Collective Code Ownership,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,User Interface Testing Team Lead/Scrum Master,5 to 10 years,11 to 50,Technology (inc. Software),Europe,3-4 years,Production,10-Jun,No,Not CMMI compliant,Some people in separate cubes in the same building,No,,,,Code Refactoring,,Collective Code Ownership,,,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,Burndown Tracking,,Coding/Database/UI Standards,,Continuous Integration (CI),,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,Collective Code Ownership,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,Pair Programming,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,Database Refactoring,Database Regression Testing,,,,Executable Specifications,,,,,,,,,,,,,,,,, IT Manager,20+ years,101 to 500,IT Consulting,Asia,5-10 years,Construction (building the system),20-Nov,No,CMMI level 3,"People in different buildings, some potentially at home, but within driving distance",No,,Active Stakeholder Participation,,,,,Continuous Integration (CI),,,,,,,,,,High-Level Release Planning,,Initial Architecture Envisioning,,Initial Requirements Envisioning,Iteration Demo,,,,,,,Retrospectives,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,Iteration Planning,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,Collective Code Ownership,,,Database Refactoring,Database Regression Testing,,,Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,,,,,Potentially Shippable Software Each Iteration,,,,,,Active Stakeholder Participation,,,,,,,,Database Regression Testing,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,Active Stakeholder Participation,,,,,,,,,,,Developer Test-Driven Development (TDD),,,Feature Team,,,,,Initial Requirements Envisioning,,,Just In Time (JIT) Model Storming,,,Potentially Shippable Software Each Iteration,,Retrospectives,, IT Manager,10 to 20 years,11 to 50,Technology (inc. Software),North America,1-2 years,Construction (building the system),10-Jun,No,Not CMMI compliant,Some people are very distant,No,,Active Stakeholder Participation,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,,Iteration Planning,,Pair Programming,,,,,,,,Active Stakeholder Participation,,,,Collective Code Ownership,,Daily Stand-Up Meeting,,,Deploy into Production,,,,,,,,,,,,Iteration Planning,,,,,,,,,,,,,,,,,,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,,,,,,,,,,,Parallel Independent Testing,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,, IT Manager,20+ years,51 to 100,e-Commerce,North America,5-10 years,Production,10-Jun,No,Not CMMI compliant,Co-located in a single room,No,,,,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,,Code Refactoring,Coding/Database/UI Standards,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,,,,,,,Retrospectives,,,,Active Stakeholder Participation,,,,,,,,Database Regression Testing,,,,,,,,,,,,,,,Pair Programming,,,,,,User Interface Testing,,,,,,,,,,,,,,,,Feature Team,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, IT Manager,5 to 10 years,1 to 10,IT Consulting,Asia,5-10 years,Production,10-Jun,Don't Know,Not CMMI compliant,Some people in separate cubes in the same building,Yes,,,,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,Initial Estimate and Schedule,,,,,Pair Programming,,,,,,,,Active Stakeholder Participation,,,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),,,,,,,,,,,,,,,,Iteration Planning,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,10 to 20 years,1 to 10,Technology (inc. Software),North America,1-2 years,Production,5-Jan,Yes,Don't Know,"People in different buildings, some potentially at home, but within driving distance",Yes,,,Burndown Tracking,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,Database Refactoring,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,,Burndown Tracking,Code Refactoring,Coding/Database/UI Standards,,Continuous Integration (CI),Daily Stand-Up Meeting,Database Refactoring,,,,,,,,,,,,,,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,Database Refactoring,Database Regression Testing,Deploy into Production,Developer Regression Testing (non-TDD),,,,,,,,,,,,,,,,,,User Interface Refactoring,User Interface Testing,,,,,,,,,,,,,,,,,High-Level Release Planning,,,,,,Iteration Planning,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,, QA/Test,10 to 20 years,11 to 50,Other,North America,5-10 years,Construction (building the system),21-50,No,Don't Know,Some people in separate cubes in the same building,No,,,,Code Refactoring,Coding/Database/UI Standards,,Continuous Integration (CI),,,,,,,,,,High-Level Release Planning,,,,,,Iteration Planning,,Pair Programming,,,,,,User Interface Testing,,,,,Coding/Database/UI Standards,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,Developer Regression Testing (non-TDD),,,,,,,,,,,Iteration Planning,,Pair Programming,,,,,,,,,Burndown Tracking,,,,,,,,,,,Executable Specifications,,Feature Team,,Identify Project Vision,,,,,,,,,,,Retrospectives,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,Identify Project Vision,,,,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,Just In Time (JIT) Model Storming,,,Potentially Shippable Software Each Iteration,,,, Team Lead/Scrum Master,5 to 10 years,1 to 10,Technology (inc. Software),Asia,3-4 years,Iteration 0/Start Up/Inception,5-Jan,No,Not CMMI compliant,Some people are very distant,Yes,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,Retrospectives,,,,,,,,,,,Database Refactoring,Database Regression Testing,,,,,,,High-Level Release Planning,,,,Initial Requirements Envisioning,,,,,,,,,,,,,,,,,,,,Database Regression Testing,,,,Executable Specifications,,,,,,,,,,,,,,,,,,,,,,,,,,Database Refactoring,,,,,,,Feature Team,,,,,,,,,,Parallel Independent Testing,,,,, Developer/Agile Team Member,5 to 10 years,51 to 100,Technology (inc. Software),North America,3-4 years,Construction (building the system),201-500,Yes,Not CMMI compliant,Some people are very distant,Yes,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,Continuous Integration (CI),,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,,,,,,Code Refactoring,Coding/Database/UI Standards,,,,,Database Regression Testing,,,Developer Test-Driven Development (TDD),,Feasability Study,,,,,,,Iteration Demo,Iteration Planning,,,,,,,,,,,Burndown Tracking,,Coding/Database/UI Standards,,,Daily Stand-Up Meeting,,,,,,,,,,,Initial Architecture Envisioning,Initial Estimate and Schedule,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,Daily Stand-Up Meeting,,,,Developer Regression Testing (non-TDD),,,,,,,,,,,,,Pair Programming,Parallel Independent Testing,,,,,,,,Burndown Tracking,,,,,,Database Refactoring,Database Regression Testing,,,,,,,,,,,,Iteration Demo,,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,, Team Lead/Scrum Master,10 to 20 years,51 to 100,IT Consulting,North America,1-2 years,Transition/Release/End-Game (deliverying into production),21-50,No,Not CMMI compliant,Some people in separate cubes in the same building,No,,,,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),,Database Refactoring,Database Regression Testing,,,,,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,Code Refactoring,,,Continuous Integration (CI),,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,Identify Project Vision,,,,,,Just In Time (JIT) Model Storming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,5 to 10 years,51 to 100,Technology (inc. Software),South/Central America,< 1 year,Iteration 0/Start Up/Inception,10-Jun,No,Not CMMI compliant,Co-located in a single room,Yes,,Active Stakeholder Participation,,,,,Continuous Integration (CI),,,,,,,,,,,,Initial Architecture Envisioning,,,Iteration Demo,Iteration Planning,,Pair Programming,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,Coding/Database/UI Standards,,,,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,Iteration Planning,,,,,,,,,,,,,Coding/Database/UI Standards,,Continuous Integration (CI),,,,,,,Executable Specifications,,,,,,,,,,,,,,,,,,,Active Stakeholder Participation,,,Coding/Database/UI Standards,,Continuous Integration (CI),,,,,,,Executable Specifications,,,,,,,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,, Developer/Agile Team Member,5 to 10 years,51 to 100,Technology (inc. Software),South/Central America,1-2 years,Iteration 0/Start Up/Inception,10-Jun,Yes,Not CMMI compliant,Co-located in a single room,No,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,,,,Pair Programming,,,,,,,,Active Stakeholder Participation,Burndown Tracking,,,,,,,,,,,,Feasability Study,,High-Level Release Planning,Identify Project Vision,,,Initial Requirements Envisioning,,,,,,Potentially Shippable Software Each Iteration,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,Continuous Integration (CI),,Database Refactoring,Database Regression Testing,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Developer Regression Testing (non-TDD),,,,,,,,,,,,,,,,,,,,,,,,,,,,Database Refactoring,,,,,,,Feature Team,,,,,,,,Just In Time (JIT) Model Storming,,,,,,,User Interface Testing Developer/Agile Team Member,Less than 2 years,1 to 10,Other,North America,< 1 year,Iteration 0/Start Up/Inception,5-Jan,Don't Know,Not CMMI compliant,Co-located in a single room,No,,,,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,Initial Architecture Envisioning,,,Iteration Demo,Iteration Planning,,Pair Programming,,,,,,,,,,,,Collective Code Ownership,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,Initial Architecture Envisioning,,Initial Requirements Envisioning,Iteration Demo,,,Pair Programming,,,,,,,,,,Code Refactoring,,,,Daily Stand-Up Meeting,Database Refactoring,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,,,,,,,,,User Interface Testing,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,Just In Time (JIT) Model Storming,,,,,,,,,,,,,Collective Code Ownership,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,10 to 20 years,1 to 10,Government,North America,3-4 years,Construction (building the system),10-Jun,No,Not CMMI compliant,Some people are very distant,No,,,Burndown Tracking,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,Retrospectives,,,,,Burndown Tracking,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,,,,,Retrospectives,,,,Active Stakeholder Participation,,,,,,,Database Refactoring,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,,,,,,Ranked Work Item List/Product Backlog,,User Interface Refactoring,User Interface Testing,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Database Regression Testing,,,,,,,,,Initial Architecture Envisioning,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,,, Developer/Agile Team Member,20+ years,1 to 10,Technology (inc. Software),North America,5-10 years,Production,5-Jan,No,Not CMMI compliant,Co-located in a single room,No,,,,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,Initial Requirements Envisioning,,,,Pair Programming,,,,,,User Interface Testing,,,,Code Refactoring,,,,Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,Initial Requirements Envisioning,,Iteration Planning,,Pair Programming,,,,,,User Interface Testing,,,Burndown Tracking,,,,,,,,,,,,,Feature Team,,,,,,Iteration Demo,,,,Parallel Independent Testing,,,Retrospectives,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,,,Initial Estimate and Schedule,,,,,,,,Ranked Work Item List/Product Backlog,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,20+ years,1000+,Technology (inc. Software),North America,5-10 years,Production,10-Jun,Yes,Not CMMI compliant,Co-located in a single room,Yes,,Active Stakeholder Participation,,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,,,,,,,,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,,Executable Specifications,,,,,,,,,,,,,,,,User Interface Refactoring,,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Database Refactoring,,,,,Executable Specifications,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,5 to 10 years,101 to 500,Technology (inc. Software),Asia,1-2 years,Construction (building the system),10-Jun,No,CMMI level 5,Some people are very distant,Yes,,Active Stakeholder Participation,,,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,Identify Project Vision,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Ranked Work Item List/Product Backlog,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,,,,,,,,,,,,,User Interface Refactoring,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,User Interface Refactoring, IT Manager,10 to 20 years,11 to 50,IT Consulting,North America,5-10 years,Construction (building the system),21-50,Yes,Not CMMI compliant,Co-located in a single room,No,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,Initial Estimate and Schedule,,Iteration Demo,Iteration Planning,,,,,,,,,,,,,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,Identify Project Vision,,,,Iteration Demo,,,,,,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,,,Database Refactoring,,,,,,,,,,,,,,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,Collective Code Ownership,,,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,,,Database Refactoring,Database Regression Testing,,,,,,,,,,,,,,,Pair Programming,Parallel Independent Testing,,,,, Developer/Agile Team Member,2 to 5 years,1 to 10,Technology (inc. Software),Europe,1-2 years,Production,5-Jan,Yes,Not CMMI compliant,"People in different buildings, some potentially at home, but within driving distance",Yes,,Active Stakeholder Participation,,,Coding/Database/UI Standards,Collective Code Ownership,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Collective Code Ownership,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,Just In Time (JIT) Model Storming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Code Refactoring,Coding/Database/UI Standards,,Continuous Integration (CI),Daily Stand-Up Meeting,,Database Regression Testing,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,10 to 20 years,11 to 50,Financial,Asia,5-10 years,Construction (building the system),20-Nov,No,Not CMMI compliant,"People in different buildings, some potentially at home, but within driving distance",No,,,,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,Collective Code Ownership,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,Pair Programming,,,,,,User Interface Testing,,,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,,,,,,,,Feasability Study,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,,,,,,,,,,, IT Manager,20+ years,11 to 50,Technology (inc. Software),Asia,3-4 years,Construction (building the system),5-Jan,No,Not CMMI compliant,Co-located in a single room,No,,,Burndown Tracking,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,Iteration Demo,,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,Identify Project Vision,Initial Architecture Envisioning,Initial Estimate and Schedule,,,,,Pair Programming,,,,,,,,,,,,,,,,,Deploy into Production,,,,,,,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,Database Regression Testing,,,,Executable Specifications,Feasability Study,,,Identify Project Vision,,,Initial Requirements Envisioning,,,,,,Potentially Shippable Software Each Iteration,,,User Interface Refactoring, IT Manager,20+ years,51 to 100,Financial,South/Central America,3-4 years,Transition/Release/End-Game (deliverying into production),10-Jun,No,Not CMMI compliant,Co-located in a single room,No,,,Burndown Tracking,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,Ranked Work Item List/Product Backlog,,,,,,,,,,Continuous Integration (CI),,,,,,,,,,,,,,,,Iteration Planning,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,User Interface Testing Developer/Agile Team Member,10 to 20 years,1 to 10,Technology (inc. Software),North America,3-4 years,Transition/Release/End-Game (deliverying into production),5-Jan,No,Not CMMI compliant,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,Code Refactoring,,,Continuous Integration (CI),,,,,,,,,,,,,,,Iteration Demo,Iteration Planning,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,Continuous Integration (CI),,,,,,,,,,,,,,,Iteration Demo,Iteration Planning,,,,,,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,Identify Project Vision,,,,,,,Pair Programming,,,,,,User Interface Testing,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,User Interface Testing,,,,,Coding/Database/UI Standards,,,,,Database Regression Testing,,,,,,,,,,,,,,,,,,,,User Interface Refactoring, Team Lead/Scrum Master,10 to 20 years,501 to 1000,IT Consulting,Australia/NZ,5-10 years,Production,20-Nov,Don't Know,Not CMMI compliant,Co-located in a single room,No,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,Code Refactoring,,Collective Code Ownership,,,,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,,,,Pair Programming,,,,,,,,,Burndown Tracking,,Coding/Database/UI Standards,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,Executable Specifications,,,,,,,,Iteration Demo,,,,,,,Retrospectives,,,,Active Stakeholder Participation,,,,,,,Database Refactoring,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,User Interface Refactoring,User Interface Testing,,,Burndown Tracking,,,,,,,,Deploy into Production,,,,,,,,Initial Architecture Envisioning,Initial Estimate and Schedule,,,Iteration Planning,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,5 to 10 years,11 to 50,Technology (inc. Software),North America,< 1 year,Transition/Release/End-Game (deliverying into production),5-Jan,No,Not CMMI compliant,Co-located in a single room,Don't Know,,,,,Coding/Database/UI Standards,Collective Code Ownership,,,,,,,Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,,User Interface Testing,,,,,Coding/Database/UI Standards,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,,,User Interface Testing,,,Burndown Tracking,,,,,,,,,,,,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,,,,,,,,,Parallel Independent Testing,,,Retrospectives,,,,,Burndown Tracking,Code Refactoring,,,,Daily Stand-Up Meeting,,,,,,,,,,,Initial Architecture Envisioning,,,,,,,,,,,, Business Stakeholder,20+ years,11 to 50,Technology (inc. Software),North America,5-10 years,Construction (building the system),21-50,No,Not CMMI compliant,Co-located in a single room,Yes,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,Initial Estimate and Schedule,,Iteration Demo,,,,,,Ranked Work Item List/Product Backlog,,,,,,,,,Collective Code Ownership,,,Database Refactoring,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,Code Refactoring,,,,,,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,,,,Just In Time (JIT) Model Storming,,,,,,, IT Manager,10 to 20 years,51 to 100,Manufacturing,North America,5-10 years,Production,21-50,Yes,Not CMMI compliant,Some people are very distant,No,,Active Stakeholder Participation,,,,Collective Code Ownership,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,,,,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,Active Stakeholder Participation,,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,,,,,,,,,,,,,,,,Iteration Demo,,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,,,Collective Code Ownership,Continuous Integration (CI),,,,,,,Executable Specifications,,,,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,,User Interface Refactoring,,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,Initial Requirements Envisioning,,,,,,,,,, Team Lead/Scrum Master,10 to 20 years,1 to 10,IT Consulting,Australia/NZ,5-10 years,Construction (building the system),5-Jan,No,Not CMMI compliant,Co-located in a single room,No,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,Burndown Tracking,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,,,,,High-Level Release Planning,,,,Initial Requirements Envisioning,,,,,,,Ranked Work Item List/Product Backlog,,,User Interface Testing,,Active Stakeholder Participation,,,,,,,,,,,,Executable Specifications,Feasability Study,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,User Interface Testing Other,20+ years,11 to 50,IT Consulting,North America,> 10 years,Transition/Release/End-Game (deliverying into production),21-50,Yes,Not CMMI compliant,Co-located in a single room,No,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,20+ years,101 to 500,Other,North America,1-2 years,Construction (building the system),20-Nov,Yes,Not CMMI compliant,Some people in separate cubes in the same building,No,Acceptance/Story Test-Driven Development (TDD),,,,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,Iteration Demo,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,,,Collective Code Ownership,,,Database Refactoring,Database Regression Testing,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,Burndown Tracking,,,,,,Database Refactoring,,,,,,,,,,,,,,,,,,,,,,,,,,Code Refactoring,,Collective Code Ownership,,,Database Refactoring,Database Regression Testing,,,,,,,,,,,,,,,Pair Programming,,,,,, Developer/Agile Team Member,20+ years,1 to 10,IT Consulting,North America,< 1 year,Elaboration (proving the architecture),5-Jan,No,Not CMMI compliant,Some people are very distant,No,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,Coding/Database/UI Standards,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,,,,Initial Requirements Envisioning,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,,Code Refactoring,,,,,,,Deploy into Production,Developer Regression Testing (non-TDD),,Executable Specifications,,,,,,,,,,,Pair Programming,Parallel Independent Testing,,,,,User Interface Testing,,,,,,,,,,,Deploy into Production,Developer Regression Testing (non-TDD),,,,,,,,,Initial Requirements Envisioning,,,,,Parallel Independent Testing,,,,User Interface Refactoring,,,,Burndown Tracking,,,Collective Code Ownership,Continuous Integration (CI),,,,,,,Executable Specifications,,,,,,,,,,Just In Time (JIT) Model Storming,,Parallel Independent Testing,,,,,User Interface Testing Team Lead/Scrum Master,10 to 20 years,11 to 50,Technology (inc. Software),North America,3-4 years,Construction (building the system),10-Jun,No,Don't Know,Some people are very distant,No,,Active Stakeholder Participation,Burndown Tracking,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,Burndown Tracking,,,,,,,,,,,,,,,Identify Project Vision,,,,,,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,Collective Code Ownership,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,,Iteration Demo,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Executable Specifications,,,,,,,,,,,Pair Programming,,,,,, IT Manager,10 to 20 years,51 to 100,Manufacturing,North America,> 10 years,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,2 to 5 years,51 to 100,IT Consulting,Europe,< 1 year,Construction (building the system),5-Jan,No,Not CMMI compliant,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),,,,Coding/Database/UI Standards,,,,,,,,,Executable Specifications,,,,,,,,,,,Pair Programming,,,,,,,,,,,Coding/Database/UI Standards,,Continuous Integration (CI),,Database Refactoring,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,Initial Architecture Envisioning,,,,,,,,,Ranked Work Item List/Product Backlog,,,,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,5 to 10 years,51 to 100,e-Commerce,North America,5-10 years,Construction (building the system),5-Jan,No,CMMI level 4,"People in different buildings, some potentially at home, but within driving distance",No,,,,Code Refactoring,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Just In Time (JIT) Model Storming,,,,,,,,,,,Code Refactoring,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Developer Regression Testing (non-TDD),,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,10 to 20 years,51 to 100,e-Commerce,North America,5-10 years,Transition/Release/End-Game (deliverying into production),20-Nov,No,Not CMMI compliant,Co-located in a single room,No,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,Code Refactoring,,,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,Iteration Demo,,Just In Time (JIT) Model Storming,,,,,,,,,,Burndown Tracking,Code Refactoring,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,,,User Interface Refactoring,,,,,,,,,,,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,Initial Architecture Envisioning,,,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,Executable Specifications,,,,,,Initial Estimate and Schedule,,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,Collective Code Ownership,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,, Business Stakeholder,10 to 20 years,51 to 100,Manufacturing,North America,5-10 years,Construction (building the system),10-Jun,Yes,Not CMMI compliant,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,Collective Code Ownership,,,,,,,,,,,,,,,,,Iteration Planning,,,,,,Retrospectives,,User Interface Testing,,,,,,,,,,,,,,Executable Specifications,,,,,,,,Iteration Demo,,,Pair Programming,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,Database Refactoring,,,,,,,,,,,,,,,Just In Time (JIT) Model Storming,,,,,,, Developer/Agile Team Member,10 to 20 years,1 to 10,IT Consulting,North America,3-4 years,Elaboration (proving the architecture),5-Jan,No,Not CMMI compliant,Co-located in a single room,Yes,,,,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,Initial Architecture Envisioning,,Initial Requirements Envisioning,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,,,,,,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,Initial Architecture Envisioning,,,,Iteration Planning,Just In Time (JIT) Model Storming,,,Potentially Shippable Software Each Iteration,,,,,,,Burndown Tracking,,,,,,,,,Developer Regression Testing (non-TDD),,Executable Specifications,,,,Identify Project Vision,,Initial Estimate and Schedule,,,,,Pair Programming,,,Ranked Work Item List/Product Backlog,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,Feature Team,High-Level Release Planning,Identify Project Vision,,Initial Estimate and Schedule,,Iteration Demo,,,,,,,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,Developer Regression Testing (non-TDD),,,,Feature Team,,,Initial Architecture Envisioning,,,Iteration Demo,,,Pair Programming,Parallel Independent Testing,,,,, Other,10 to 20 years,1000+,Technology (inc. Software),North America,3-4 years,Transition/Release/End-Game (deliverying into production),Don't Know,Don't Know,Not CMMI compliant,"People in different buildings, some potentially at home, but within driving distance",No,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,Identify Project Vision,,Initial Estimate and Schedule,,Iteration Demo,Iteration Planning,,,,,,Retrospectives,,,,Active Stakeholder Participation,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,,,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,Developer Regression Testing (non-TDD),,,,,,,Initial Architecture Envisioning,,,,,,,,,,,User Interface Refactoring,User Interface Testing,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,Deploy into Production,Developer Regression Testing (non-TDD),,,,,,,,,,,,Just In Time (JIT) Model Storming,,,Potentially Shippable Software Each Iteration,,,User Interface Refactoring, Team Lead/Scrum Master,5 to 10 years,1 to 10,Technology (inc. Software),South/Central America,1-2 years,Construction (building the system),5-Jan,Yes,Not CMMI compliant,Co-located in a single room,Yes,,,Burndown Tracking,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,,Continuous Integration (CI),,Database Refactoring,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,User Interface Testing,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,,Executable Specifications,,,High-Level Release Planning,,Initial Architecture Envisioning,,,,,,,,,,,,User Interface Testing Team Lead/Scrum Master,10 to 20 years,11 to 50,Technology (inc. Software),North America,1-2 years,Production,20-Nov,Yes,Not CMMI compliant,Some people in separate cubes in the same building,No,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,,,Iteration Planning,,Pair Programming,,,Ranked Work Item List/Product Backlog,,,User Interface Testing,,Active Stakeholder Participation,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,,Iteration Planning,,,,,,,,,,,Burndown Tracking,,,,,,,,,,,Executable Specifications,,,,Identify Project Vision,Initial Architecture Envisioning,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Parallel Independent Testing,,,,, IT Manager,10 to 20 years,1000+,IT Consulting,North America,1-2 years,Iteration 0/Start Up/Inception,10-Jun,Yes,CMMI level 5,Some people in separate cubes in the same building,Yes,,Active Stakeholder Participation,,,,,,,,,,,,,,,,Identify Project Vision,,,,Iteration Demo,Iteration Planning,,,,,,,,,,,,,Coding/Database/UI Standards,,,Daily Stand-Up Meeting,,,,,,,,,,,Initial Architecture Envisioning,Initial Estimate and Schedule,,Iteration Demo,,,,,,,,,,,,,,,,,,,Database Regression Testing,,,,,,,,,,,,,,,,Parallel Independent Testing,,Ranked Work Item List/Product Backlog,,,,,,Burndown Tracking,,,,,,,,,,,,,,,,,,,,,Just In Time (JIT) Model Storming,,,,,,,,,,,,,,Continuous Integration (CI),,Database Refactoring,,,,,,,Feature Team,,,,,,,,,,,,,,, Team Lead/Scrum Master,10 to 20 years,1 to 10,Manufacturing,Europe,1-2 years,Construction (building the system),5-Jan,No,Not CMMI compliant,Co-located in a single room,Yes,,,,,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,,,,,,,,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,,,,,,,,,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,,,,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Deploy into Production,,,,,,,,,,,,,,,,,,,, Other,20+ years,1 to 10,IT Consulting,North America,> 10 years,Production,5-Jan,No,Not CMMI compliant,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,Code Refactoring,,,Continuous Integration (CI),,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,,,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,,Active Stakeholder Participation,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,User Interface Testing,,,Burndown Tracking,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, IT Manager,10 to 20 years,11 to 50,Technology (inc. Software),North America,3-4 years,Construction (building the system),5-Jan,No,Not CMMI compliant,"People in different buildings, some potentially at home, but within driving distance",No,,Active Stakeholder Participation,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,Active Stakeholder Participation,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,Retrospectives,,,,,Burndown Tracking,Code Refactoring,,,,,,,,,,,,,,,,,,,Iteration Planning,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Collective Code Ownership,,,,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,, IT Manager,20+ years,1 to 10,Technology (inc. Software),South/Central America,> 10 years,Production,5-Jan,No,Not CMMI compliant,Co-located in a single room,Yes,,Active Stakeholder Participation,,,Coding/Database/UI Standards,,,,,,,,,,,Feature Team,,Identify Project Vision,,Initial Estimate and Schedule,Initial Requirements Envisioning,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,Feature Team,High-Level Release Planning,,,,,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,Active Stakeholder Participation,,,,,,,Database Refactoring,Database Regression Testing,,Developer Regression Testing (non-TDD),,,Feasability Study,,,,Initial Architecture Envisioning,,Initial Requirements Envisioning,,,,,,,,,,,,,Burndown Tracking,,,Collective Code Ownership,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,Database Refactoring,Database Regression Testing,,,,,,,,,,,,,,Just In Time (JIT) Model Storming,,Parallel Independent Testing,,,,, Team Lead/Scrum Master,20+ years,1 to 10,IT Consulting,North America,< 1 year,Production,10-Jun,No,Don't Know,Some people are very distant,No,,Active Stakeholder Participation,Burndown Tracking,,,,,,,,,,,,,,,,,,,Iteration Demo,,,,Parallel Independent Testing,,,Retrospectives,,,,,Burndown Tracking,,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,User Interface Testing,Acceptance/Story Test-Driven Development (TDD),,,,,,,Daily Stand-Up Meeting,,,,,,Executable Specifications,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,Iteration Demo,,,Pair Programming,,,,,, Team Lead/Scrum Master,10 to 20 years,1 to 10,Manufacturing,North America,1-2 years,Don't Know,5-Jan,No,Not CMMI compliant,Co-located in a single room,Yes,,,,,,Collective Code Ownership,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,Ranked Work Item List/Product Backlog,,,,,,,Code Refactoring,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,Continuous Integration (CI),,,,,,,,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Active Stakeholder Participation,Burndown Tracking,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,Initial Estimate and Schedule,,,Iteration Planning,,,,,,,,User Interface Testing IT Manager,10 to 20 years,101 to 500,Technology (inc. Software),North America,5-10 years,Iteration 0/Start Up/Inception,20-Nov,Yes,Don't Know,Some people are very distant,No,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,Identify Project Vision,,Initial Estimate and Schedule,,Iteration Demo,Iteration Planning,,,,,,Retrospectives,,,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,Iteration Demo,Iteration Planning,,,,,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,Coding/Database/UI Standards,,Continuous Integration (CI),,,,,,,,,,,,,,Initial Requirements Envisioning,,,,,,Potentially Shippable Software Each Iteration,,,,User Interface Testing,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,,,Continuous Integration (CI),,,,,,,,,,,,Initial Architecture Envisioning,,Initial Requirements Envisioning,,,Just In Time (JIT) Model Storming,,,Potentially Shippable Software Each Iteration,,,, IT Manager,10 to 20 years,1 to 10,Technology (inc. Software),North America,3-4 years,Production,10-Jun,No,CMMI level 2,Some people in separate cubes in the same building,Yes,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,,Daily Stand-Up Meeting,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,User Interface Testing,,,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Burndown Tracking,,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,,,,,,,,,,Burndown Tracking,,Coding/Database/UI Standards,,Continuous Integration (CI),,,,,,,,,,,,,,,,,,,,,,,User Interface Refactoring, Team Lead/Scrum Master,10 to 20 years,1000+,Financial,North America,< 1 year,Iteration 0/Start Up/Inception,10-Jun,Yes,Not CMMI compliant,Some people in separate cubes in the same building,Yes,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,Pair Programming,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,,,,,,,,,,,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,20+ years,51 to 100,Technology (inc. Software),North America,> 10 years,Construction (building the system),10-Jun,No,Not CMMI compliant,Some people are very distant,Yes,,Active Stakeholder Participation,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,Initial Requirements Envisioning,Iteration Demo,Iteration Planning,,,,,,Retrospectives,,,,,,,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,,,Potentially Shippable Software Each Iteration,,,User Interface Refactoring,,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,Parallel Independent Testing,,,,,,,Active Stakeholder Participation,,,,,Continuous Integration (CI),,,,,,,,,,,,,,,,,,,,,,,, IT Manager,20+ years,1 to 10,Other,North America,5-10 years,Construction (building the system),5-Jan,No,Not CMMI compliant,Some people are very distant,No,,,,,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,5 to 10 years,1 to 10,Other,North America,3-4 years,Transition/Release/End-Game (deliverying into production),5-Jan,No,Not CMMI compliant,Co-located in a single room,No,,Active Stakeholder Participation,,Code Refactoring,,,Continuous Integration (CI),,,,,,,,,,,Identify Project Vision,,,,,Iteration Planning,,Pair Programming,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,Feasability Study,,High-Level Release Planning,Identify Project Vision,,,Initial Requirements Envisioning,Iteration Demo,Iteration Planning,,,,,,Retrospectives,,,,,,Code Refactoring,,,Continuous Integration (CI),,Database Refactoring,Database Regression Testing,,,,,,,,,,Initial Estimate and Schedule,,,,Just In Time (JIT) Model Storming,Pair Programming,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,Executable Specifications,,,,,,,,,,,,,,,,,,,,,,,,,,,Database Regression Testing,,,,Executable Specifications,,Feature Team,,,,,,,,,,,,,,, Developer/Agile Team Member,20+ years,11 to 50,Technology (inc. Software),North America,3-4 years,Transition/Release/End-Game (deliverying into production),10-Jun,Yes,Not CMMI compliant,Co-located in a single room,Yes,,,,,Coding/Database/UI Standards,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,,,,,,Burndown Tracking,Code Refactoring,Coding/Database/UI Standards,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,Database Regression Testing,,,,,,,,,,Initial Estimate and Schedule,,,,,,Parallel Independent Testing,,,,,,,,,,,,,,,Database Regression Testing,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,,Executable Specifications,,,,,,,,,,,Pair Programming,Parallel Independent Testing,,,,, IT Manager,10 to 20 years,101 to 500,IT Consulting,South/Central America,3-4 years,Transition/Release/End-Game (deliverying into production),10-Jun,No,CMMI level 2,Some people in separate cubes in the same building,Yes,,,Burndown Tracking,,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,,Iteration Planning,,,,,,Retrospectives,,,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,Feasability Study,,,Identify Project Vision,,,Initial Requirements Envisioning,,,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,Database Refactoring,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,User Interface Refactoring,,,,,,,,,,Database Refactoring,Database Regression Testing,,,,Executable Specifications,,,,,,,,,,Just In Time (JIT) Model Storming,Pair Programming,,Potentially Shippable Software Each Iteration,,,,User Interface Testing,,,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,User Interface Refactoring, Developer/Agile Team Member,20+ years,1000+,Financial,North America,1-2 years,Production,20-Nov,Yes,Not CMMI compliant,Co-located in a single room,No,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,Code Refactoring,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,Pair Programming,,,,Retrospectives,,,,,Burndown Tracking,,,,,,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,,,,,,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,Database Refactoring,,,Developer Regression Testing (non-TDD),,,,,,,,,,,,,Pair Programming,,,,,,,,,Burndown Tracking,,,,,,,,,Developer Regression Testing (non-TDD),,,,,,,,,,,,,,,,,,,,,,,,,,,,Database Refactoring,,,Developer Regression Testing (non-TDD),,,,,,,,,,,,,,,,,,,User Interface Testing IT Manager,20+ years,51 to 100,Financial,North America,5-10 years,Production,20-Nov,Yes,Not CMMI compliant,Some people are very distant,No,,Active Stakeholder Participation,Burndown Tracking,,,,,,,,,,,Executable Specifications,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Initial Estimate and Schedule,,,Iteration Planning,,,,,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,2 to 5 years,1 to 10,Retail,North America,3-4 years,Production,10-Jun,No,Not CMMI compliant,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,Burndown Tracking,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,Deploy into Production,,,,,,High-Level Release Planning,,,,,,,,,,,,,,,,,Burndown Tracking,,Coding/Database/UI Standards,,,Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,Retrospectives,,,,Active Stakeholder Participation,,,,,,,,,,,,,,Feature Team,,Identify Project Vision,,,,Iteration Demo,,,,Parallel Independent Testing,,,,,User Interface Testing,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,20+ years,11 to 50,Technology (inc. Software),North America,5-10 years,Construction (building the system),10-Jun,Yes,Not CMMI compliant,Some people in separate cubes in the same building,No,,,,,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,,Initial Architecture Envisioning,Initial Estimate and Schedule,,,,,,,,,,,,,,Burndown Tracking,,,Collective Code Ownership,,,,,,,,,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,,,Collective Code Ownership,,,,,,,,,,,,,,,,Iteration Demo,,,Pair Programming,,,Ranked Work Item List/Product Backlog,,, Other,10 to 20 years,1 to 10,Technology (inc. Software),North America,3-4 years,Construction (building the system),5-Jan,No,Not CMMI compliant,Some people in separate cubes in the same building,No,,Active Stakeholder Participation,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,,,Iteration Planning,,,,,,Retrospectives,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,Developer Regression Testing (non-TDD),,,,,High-Level Release Planning,,,,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,User Interface Refactoring,User Interface Testing,,,,Code Refactoring,,,,,,,,,,,,,,,,,,Iteration Demo,,,,,Potentially Shippable Software Each Iteration,,,,,Acceptance/Story Test-Driven Development (TDD),,,,Coding/Database/UI Standards,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,,User Interface Testing Team Lead/Scrum Master,10 to 20 years,11 to 50,Technology (inc. Software),North America,5-10 years,Transition/Release/End-Game (deliverying into production),10-Jun,No,Not CMMI compliant,Some people are very distant,No,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,Iteration Demo,,,,,,,Retrospectives,,,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,User Interface Refactoring,,,,,,,,,,,,,,,,,,,,Initial Architecture Envisioning,,,,,,,,,,,, Developer/Agile Team Member,2 to 5 years,1 to 10,e-Commerce,Europe,1-2 years,Production,10-Jun,Don't Know,Don't Know,Co-located in a single room,Yes,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,,,Iteration Demo,,,,,Potentially Shippable Software Each Iteration,,,,,,,,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,Initial Architecture Envisioning,,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,,,,,Active Stakeholder Participation,Burndown Tracking,,,,,,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,,,,,,,,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,Developer Regression Testing (non-TDD),,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,, Operations/Support,20+ years,11 to 50,Technology (inc. Software),Europe,None,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Other,10 to 20 years,11 to 50,Technology (inc. Software),North America,5-10 years,Production,20-Nov,Yes,Not CMMI compliant,Some people are very distant,No,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,Continuous Integration (CI),,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Burndown Tracking,,,,,,,,,,,,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,5 to 10 years,1000+,Technology (inc. Software),North America,5-10 years,Construction (building the system),21-50,Yes,Not CMMI compliant,Some people are very distant,Yes,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,,,,Continuous Integration (CI),,,,,,,,,,High-Level Release Planning,,,,,,Iteration Planning,,Pair Programming,,,,Retrospectives,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,,,,,,,Deploy into Production,,,,,,,Identify Project Vision,,,,,,,,,,,,, Other,20+ years,1000+,Technology (inc. Software),Europe,5-10 years,Construction (building the system),51-100,Yes,Not CMMI compliant,Some people are very distant,No,Acceptance/Story Test-Driven Development (TDD),,,,,,Continuous Integration (CI),,,,,,,,,,,Identify Project Vision,,,,,,,,,,,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,Initial Architecture Envisioning,,,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Active Stakeholder Participation,,,,,Continuous Integration (CI),,,,,,,,,,,,,,,,,,,,,,,, Other,10 to 20 years,1 to 10,IT Consulting,Europe,5-10 years,Construction (building the system),51-100,Yes,Not CMMI compliant,Some people are very distant,Yes,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,Iteration Planning,,,,,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Collective Code Ownership,,,,,,Developer Regression Testing (non-TDD),,,,,,Identify Project Vision,,,,,,Just In Time (JIT) Model Storming,Pair Programming,,,,,User Interface Refactoring,User Interface Testing Developer/Agile Team Member,2 to 5 years,501 to 1000,Financial,North America,1-2 years,Production,10-Jun,Yes,Don't Know,Some people in separate cubes in the same building,Yes,,Active Stakeholder Participation,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,Retrospectives,,,,,Burndown Tracking,,,,,,,,,,,,,,,,Initial Architecture Envisioning,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,Identify Project Vision,,,Initial Requirements Envisioning,Iteration Demo,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,, IT Manager,5 to 10 years,1 to 10,Other,North America,< 1 year,Production,5-Jan,No,Not CMMI compliant,Co-located in a single room,No,Acceptance/Story Test-Driven Development (TDD),,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,,,Iteration Demo,,,Pair Programming,,,,,,,,,,,,,Continuous Integration (CI),,,,,Developer Regression Testing (non-TDD),,,,,,,,,,Iteration Demo,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Product Owner,5 to 10 years,1 to 10,Technology (inc. Software),South/Central America,3-4 years,Production,10-Jun,Yes,Not CMMI compliant,Co-located in a single room,No,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,Iteration Planning,,,,,,,,,,,,,,Collective Code Ownership,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,Initial Estimate and Schedule,,Iteration Demo,Iteration Planning,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Just In Time (JIT) Model Storming,,,,,,,,,,,,,,,,,,,,,,Feasability Study,,,,,,,,,,Pair Programming,,,,,, Other,10 to 20 years,101 to 500,IT Consulting,North America,5-10 years,Construction (building the system),21-50,Yes,Not CMMI compliant,Some people are very distant,No,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,,,Iteration Planning,,,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, IT Manager,5 to 10 years,11 to 50,Other,North America,None,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, QA/Test,2 to 5 years,1 to 10,Government,South/Central America,3-4 years,Production,5-Jan,Yes,CMMI level 2,Co-located in a single room,No,,Active Stakeholder Participation,Burndown Tracking,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,Initial Estimate and Schedule,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,,,,,,Burndown Tracking,,,Collective Code Ownership,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,Retrospectives,,,,Active Stakeholder Participation,,,,,Continuous Integration (CI),,,,Deploy into Production,,,Executable Specifications,,,,,,Initial Estimate and Schedule,,,,,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Identify Project Vision,,,Initial Requirements Envisioning,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives, IT Manager,10 to 20 years,1000+,Financial,North America,3-4 years,Construction (building the system),10-Jun,No,Not CMMI compliant,Co-located in a single room,No,,Active Stakeholder Participation,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,Deploy into Production,,,,,,,,,,,,Iteration Planning,,,,,,Retrospectives,,,,,Burndown Tracking,,Coding/Database/UI Standards,,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,Identify Project Vision,,,,,Iteration Planning,,,,,,Retrospectives,,,,,,,,,,,,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,,,,Pair Programming,Parallel Independent Testing,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,Feature Team,,,,,,,,,Pair Programming,,,,,User Interface Refactoring Developer/Agile Team Member,10 to 20 years,11 to 50,Technology (inc. Software),Europe,3-4 years,Construction (building the system),5-Jan,Don't Know,Not CMMI compliant,Some people are very distant,Yes,,,Burndown Tracking,,,Collective Code Ownership,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,,,,,,,,,,Continuous Integration (CI),,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Code Refactoring,,,,,,,,,,,,,High-Level Release Planning,Identify Project Vision,,,,Iteration Demo,,,,,Potentially Shippable Software Each Iteration,,, Developer/Agile Team Member,5 to 10 years,101 to 500,Government,South/Central America,5-10 years,Construction (building the system),20-Nov,No,Not CMMI compliant,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,Feature Team,,,,,,,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,Coding/Database/UI Standards,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,Pair Programming,,,Ranked Work Item List/Product Backlog,,,,,,,Code Refactoring,,,,,,,,,Developer Test-Driven Development (TDD),,,Feature Team,High-Level Release Planning,,,,,,,Just In Time (JIT) Model Storming,,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,2 to 5 years,1 to 10,e-Commerce,Europe,3-4 years,Transition/Release/End-Game (deliverying into production),10-Jun,Don't Know,Not CMMI compliant,Co-located in a single room,No,,Active Stakeholder Participation,,,,,,Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,Initial Requirements Envisioning,,Iteration Planning,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,Initial Requirements Envisioning,,Iteration Planning,,Pair Programming,,,,Retrospectives,,,,,,Code Refactoring,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,User Interface Testing,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Database Refactoring,,,,,,,,,,,,,,,,,,,,,User Interface Refactoring Team Lead/Scrum Master,10 to 20 years,101 to 500,Technology (inc. Software),Asia,5-10 years,Construction (building the system),10-Jun,No,Not CMMI compliant,Some people are very distant,Yes,,,Burndown Tracking,Code Refactoring,,,,Daily Stand-Up Meeting,,,,,,,,,,,,Initial Estimate and Schedule,,Iteration Demo,Iteration Planning,,,,,,Retrospectives,,,,Active Stakeholder Participation,,,,,,Daily Stand-Up Meeting,,,,,,,,Feature Team,,Identify Project Vision,,,,Iteration Demo,Iteration Planning,,,,,,Retrospectives,,,Acceptance/Story Test-Driven Development (TDD),,,,,Collective Code Ownership,Continuous Integration (CI),,Database Refactoring,Database Regression Testing,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,Database Refactoring,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,Initial Estimate and Schedule,,Iteration Demo,Iteration Planning,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,Collective Code Ownership,,,,,,,,Executable Specifications,,,,,Initial Architecture Envisioning,,,,,Just In Time (JIT) Model Storming,,,Potentially Shippable Software Each Iteration,,,User Interface Refactoring Team Lead/Scrum Master,10 to 20 years,1 to 10,Technology (inc. Software),Europe,5-10 years,Transition/Release/End-Game (deliverying into production),5-Jan,No,Not CMMI compliant,Some people are very distant,No,,,,,,,,,,,,,,,,,,Identify Project Vision,Initial Architecture Envisioning,,Initial Requirements Envisioning,,,,,,Potentially Shippable Software Each Iteration,,,,,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,,Collective Code Ownership,,,Database Refactoring,,,,Developer Test-Driven Development (TDD),,,,,Identify Project Vision,,,Initial Requirements Envisioning,,,,,,,,,,,,,,,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,,,,,,User Interface Refactoring,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,Burndown Tracking,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,2 to 5 years,1 to 10,e-Commerce,South/Central America,5-10 years,Production,5-Jan,No,Not CMMI compliant,Co-located in a single room,Yes,,,,Code Refactoring,Coding/Database/UI Standards,,Continuous Integration (CI),,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,Identify Project Vision,,,,Iteration Demo,,,,,,,,,,,,,Code Refactoring,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,10 to 20 years,11 to 50,IT Consulting,North America,< 1 year,Construction (building the system),5-Jan,No,Not CMMI compliant,"People in different buildings, some potentially at home, but within driving distance",No,,,,,Coding/Database/UI Standards,Collective Code Ownership,,,,,,,,,,,,,,,,,Iteration Planning,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,5 to 10 years,1 to 10,Technology (inc. Software),Europe,3-4 years,Production,10-Jun,No,Not CMMI compliant,"People in different buildings, some potentially at home, but within driving distance",Yes,,,,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),,Database Refactoring,,Deploy into Production,,,,,,,,,,,,,,Pair Programming,,,Ranked Work Item List/Product Backlog,,,,,,,,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,Database Refactoring,,Deploy into Production,,,,,,,,,,,,Iteration Planning,,,,,,,,,,Active Stakeholder Participation,,Code Refactoring,,,,,Database Refactoring,Database Regression Testing,,,Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,,,,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,High-Level Release Planning,,,,Initial Requirements Envisioning,,,,,,,,,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,,,Initial Architecture Envisioning,,,Iteration Demo,,,,,,,, Developer/Agile Team Member,20+ years,1 to 10,IT Consulting,North America,> 10 years,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Other,5 to 10 years,1000+,Technology (inc. Software),Europe,3-4 years,Transition/Release/End-Game (deliverying into production),501+,Yes,Not CMMI compliant,Some people in separate cubes in the same building,No,,,,,,,Continuous Integration (CI),,,,,,,,,Feature Team,,,,,,Iteration Demo,Iteration Planning,,Pair Programming,,Potentially Shippable Software Each Iteration,,Retrospectives,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,Feature Team,,,,,,Iteration Demo,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,Database Regression Testing,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,Parallel Independent Testing,,,, Developer/Agile Team Member,5 to 10 years,1 to 10,IT Consulting,Europe,< 1 year,Production,5-Jan,Yes,Don't Know,"People in different buildings, some potentially at home, but within driving distance",No,,,,Code Refactoring,,,,,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,Identify Project Vision,,Initial Estimate and Schedule,,,,,,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,,,,,,Burndown Tracking,Code Refactoring,,,,,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,Initial Estimate and Schedule,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,,,,Active Stakeholder Participation,,,,Collective Code Ownership,,,,,,,,,,,,Identify Project Vision,,,,Iteration Demo,,,Pair Programming,,,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,,Coding/Database/UI Standards,Collective Code Ownership,Continuous Integration (CI),,,,,,,Executable Specifications,,,,,,,,,,,Pair Programming,,,,, Product Owner,20+ years,11 to 50,Technology (inc. Software),Asia,5-10 years,Construction (building the system),10-Jun,Yes,Not CMMI compliant,Co-located in a single room,Yes,,,Burndown Tracking,,,,,,,,,,,,,Feature Team,High-Level Release Planning,,,,Initial Requirements Envisioning,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,Feature Team,High-Level Release Planning,,,,,,Iteration Planning,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,Retrospectives,,,,,,,,,Continuous Integration (CI),,,,,,,,,,,,,,,,,Just In Time (JIT) Model Storming,,,,,, Developer/Agile Team Member,10 to 20 years,1 to 10,Technology (inc. Software),Europe,None,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,Less than 2 years,1 to 10,IT Consulting,Europe,1-2 years,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, IT Manager,10 to 20 years,11 to 50,Technology (inc. Software),Europe,3-4 years,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Other,20+ years,51 to 100,IT Consulting,North America,5-10 years,Iteration 0/Start Up/Inception,10-Jun,No,Not CMMI compliant,Some people are very distant,No,,,,Code Refactoring,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,,,,,,,Retrospectives,,,,,,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,,,,,,,Burndown Tracking,,,,,,Database Refactoring,,,Developer Regression Testing (non-TDD),,,,,,,,,Initial Requirements Envisioning,,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,,,,,Active Stakeholder Participation,Burndown Tracking,,,,,,,,,,,,,,,,,,,,,,,,,,Retrospectives,,,,Active Stakeholder Participation,,,,,,,,,,,,,,,High-Level Release Planning,,,,Initial Requirements Envisioning,,Iteration Planning,,,Parallel Independent Testing,Potentially Shippable Software Each Iteration,,,, Developer/Agile Team Member,10 to 20 years,11 to 50,Technology (inc. Software),Europe,5-10 years,Construction (building the system),20-Nov,No,Not CMMI compliant,Co-located in a single room,Yes,,,,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,Iteration Planning,Just In Time (JIT) Model Storming,Pair Programming,,,,,,,,,,,,,,,,,,,,,,,,,,,,Iteration Demo,,,,Parallel Independent Testing,,,,,,,,,,,,,Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,,,,Pair Programming,,,,Retrospectives,,,,,,,,,,,,,,,,,,Feature Team,,,,,Initial Requirements Envisioning,,,,,,,,,User Interface Refactoring,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,20+ years,101 to 500,Technology (inc. Software),North America,5-10 years,Construction (building the system),21-50,No,Not CMMI compliant,Co-located in a single room,Yes,,Active Stakeholder Participation,,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,Iteration Demo,,,Pair Programming,,,,Retrospectives,,,,,,,,,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,Iteration Planning,,,,,,,,,,Active Stakeholder Participation,,,,,,,Database Refactoring,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,Retrospectives,,,,,Burndown Tracking,,,,,,,,,,,Executable Specifications,,Feature Team,,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Developer/Agile Team Member,5 to 10 years,51 to 100,Financial,North America,3-4 years,Production,10-Jun,Yes,Not CMMI compliant,Co-located in a single room,Yes,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,Continuous Integration (CI),,,,Deploy into Production,,Developer Test-Driven Development (TDD),,,,,,,,,,,,Pair Programming,,,,Retrospectives,,,,,,,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,Iteration Demo,Iteration Planning,,Pair Programming,,,,Retrospectives,,,,Active Stakeholder Participation,,Code Refactoring,,,,,,,,,,,Feasability Study,,High-Level Release Planning,Identify Project Vision,,,Initial Requirements Envisioning,,,,,,,,,,User Interface Testing,,Active Stakeholder Participation,Burndown Tracking,,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,,,,,,,User Interface Testing,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, IT Manager,20+ years,11 to 50,e-Commerce,North America,3-4 years,Production,10-Jun,No,Not CMMI compliant,Some people in separate cubes in the same building,Yes,Acceptance/Story Test-Driven Development (TDD),Active Stakeholder Participation,,Code Refactoring,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,Initial Architecture Envisioning,,,,Iteration Planning,,,,Potentially Shippable Software Each Iteration,,,,,,Active Stakeholder Participation,,,,,,Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,,,,,,,,,,,,Ranked Work Item List/Product Backlog,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,Database Refactoring,,,,,,,,,Identify Project Vision,,Initial Estimate and Schedule,,,Iteration Planning,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,Burndown Tracking,,,,,,,,,,,,,,,,,,,,,,,,,,,User Interface Refactoring,User Interface Testing,Acceptance/Story Test-Driven Development (TDD),,,,,Collective Code Ownership,Continuous Integration (CI),,,Database Regression Testing,,,,Executable Specifications,,,,,,,,,,,Pair Programming,,,,,, Developer/Agile Team Member,10 to 20 years,1 to 10,IT Consulting,North America,5-10 years,Construction (building the system),5-Jan,No,Not CMMI compliant,Don't Know,Yes,Acceptance/Story Test-Driven Development (TDD),,,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,Iteration Demo,,,Pair Programming,,,,,,,,,,,,,Continuous Integration (CI),,,,,,,,,,,,,,,Iteration Demo,,,Pair Programming,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,,Developer Test-Driven Development (TDD),Executable Specifications,,,,,,Initial Estimate and Schedule,,,,,,,Potentially Shippable Software Each Iteration,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Team Lead/Scrum Master,20+ years,1 to 10,Technology (inc. Software),North America,5-10 years,Construction (building the system),5-Jan,No,Not CMMI compliant,Co-located in a single room,Yes,,Active Stakeholder Participation,Burndown Tracking,,,,,,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,,,,,Iteration Planning,,,,,,Retrospectives,,User Interface Testing,,,,Code Refactoring,,,,Daily Stand-Up Meeting,,,,,Developer Test-Driven Development (TDD),,,,High-Level Release Planning,,Initial Architecture Envisioning,,,,Iteration Planning,Just In Time (JIT) Model Storming,,,,,,,,,Active Stakeholder Participation,,,,Collective Code Ownership,,,,,,,,,,Feature Team,,,,Initial Estimate and Schedule,,Iteration Demo,,,Pair Programming,Parallel Independent Testing,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,Continuous Integration (CI),,Database Refactoring,,,,,,,,,,,,,,,,,,,,,, Product Owner,20+ years,1 to 10,Technology (inc. Software),North America,1-2 years,Construction (building the system),5-Jan,No,Not CMMI compliant,Some people are very distant,Yes,,,Burndown Tracking,,Coding/Database/UI Standards,Collective Code Ownership,,,,,,,,,,,High-Level Release Planning,,,,Initial Requirements Envisioning,,Iteration Planning,,,,,,,,User Interface Testing,,,,,,,,,,,,,,,,,High-Level Release Planning,,,,,,,,,,,,,,,Acceptance/Story Test-Driven Development (TDD),,,,,,,,,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),Executable Specifications,,,,,,,,,,,Pair Programming,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,,,,,,,,,,,,,,,,Developer Test-Driven Development (TDD),,,,,,,Initial Estimate and Schedule,,,,,,,Potentially Shippable Software Each Iteration,,,,,,,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,Developer Regression Testing (non-TDD),Developer Test-Driven Development (TDD),,,,,,,,,,,,,,Potentially Shippable Software Each Iteration,,,, IT Manager,10 to 20 years,11 to 50,Technology (inc. Software),North America,3-4 years,Production,20-Nov,No,Not CMMI compliant,Co-located in a single room,Yes,,Active Stakeholder Participation,,Code Refactoring,,,Continuous Integration (CI),,,,,,Developer Test-Driven Development (TDD),,,,,,,,,Iteration Demo,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,,,,,Active Stakeholder Participation,,Code Refactoring,,Collective Code Ownership,Continuous Integration (CI),Daily Stand-Up Meeting,,,,,,,,,,,,,,,,,,,,Ranked Work Item List/Product Backlog,,,,,,,,,,,,,Database Regression Testing,,,,Executable Specifications,,,,,,,Initial Requirements Envisioning,,,,,,,,Retrospectives,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Deploy into Production,,,Executable Specifications,,,,,,,,,,,,,,,,,User Interface Testing IT Manager,20+ years,101 to 500,Retail,Australia/NZ,5-10 years,Construction (building the system),51-100,Yes,CMMI level 3,"People in different buildings, some potentially at home, but within driving distance",No,,Active Stakeholder Participation,Burndown Tracking,,,,Continuous Integration (CI),,,,,,,,,,,,,Initial Estimate and Schedule,,Iteration Demo,Iteration Planning,,,,,Ranked Work Item List/Product Backlog,,,,,Active Stakeholder Participation,Burndown Tracking,,,,,Daily Stand-Up Meeting,,,,,,,,,,,,,Initial Requirements Envisioning,Iteration Demo,Iteration Planning,,,,,,Retrospectives,,,,,,,,,,,,,,Developer Regression Testing (non-TDD),,Executable Specifications,,Feature Team,,,,,,,,Just In Time (JIT) Model Storming,Pair Programming,,Potentially Shippable Software Each Iteration,Ranked Work Item List/Product Backlog,,,,,,,,,,,,,,,,,,,,,,,,,,,,Pair Programming,,,,,,,,,,,,,,,,,Deploy into Production,,,,,,,,,,,,,,,,,,,,